Baker House, Leeds - Internal Propping
This building is no longer in use. Gard was employed to install a temporary propping system to the upper floors areas as per the Structural Engineer’s design.
This building is no longer in use. Gard was employed to install a temporary propping system to the upper floors areas as per the Structural Engineer’s design.
This building is no longer in use. Gard was employed to install a temporary propping system to the upper floors areas as per the Structural Engineer’s design.